| Component | Amount (incl GST) |
|---|---|
| Base house price | $1,261,331.92 |
| Landscaping allowances | $25,770.00 |
| Excavation works | $11,000.00 |
| Pool works — pool, fence, electrical, pool void, tiling | $80,182.10 |
| Tender amount | $1,378,284.02 |
What the fixed price carries: construction drawings for your block · full engineering design and inspections · energy efficiency report · an 8-hour colour selection with our Interior Designer plus four structured review meetings · QBCC warranty insurance · Portable Long Service Levy · building certification including pool approvals · NBN provision · temporary fencing, site toilet, skip bins and EPA controls · crane, scaffolding and fall protection · six survey set-out visits.
Thank you for the opportunity to tender for your new home. This proposal sets out everything we propose to build, at a fixed price, with nothing hidden in the fine print. From the first plan review to the walkthrough at handover, you deal with us directly.
Cover and rear renders by Elevate Design Studio, from the estimating drawing set (Rev J, 10.08.26). Images and plans are indicative only and must adhere to the NCC and AS standards for construction. Plans © Elevate Design Studio. This tender proposal is to be read in conjunction with your Tender Specification.
A two-storey, four-bedroom + study residence over a 307 m² lot — 2720 mm ceilings both levels, open-rise stair, 12 m pool and alfresco to the north-west.
| First floor | 156 m² |
| Ground floor | 96 m² |
| Garage | 38 m² |
| Alfresco | 17 m² |
| Porch | 6 m² |
| Grand total | 313 m² |
Verify dimensions and levels on site. Plans © Elevate Design Studio — estimating drawings Rev J (05.08.26).
Everything below is in your tender, grouped by trade family. Items marked PS are provisional sums with stated values; grey rows are explicit exclusions kept where they belong, in context.
Supply and installation of 10.47 lineal metres of temporary fencing — a council requirement for site safety.
Hire and cleaning, as needed, for use by trades on site — a council requirement.
Supply and servicing of skip bins during construction.
Silt barrier including stakes and gravel crossover — council requirements protecting waterways from silt run-off.
Six surveying visits to pin the pool, retaining wall locations, footings and piers, and slab corners — up to 30 points.
Client to allow for connection to permanent power pole with temporary meter box, installed prior to site start.
Rental of crane equipment for lifting of materials during the construction period.
Supply, erect and dismantle of scaffolding used during construction.
Rafter guardrail system, hang-on light-duty work platform, roof platform and stair void protection. Mesh panels not allowed — only usually required on commercial sites; a variation can be provided if council requires.
Traffic management plans and fees are not included. If required, costs are passed on to client.
Excludes demolition, rock breaking and removal of rock.
Construction drawings specific to your block. Additional consultant management not included — a quote can be provided if required.
Bracing and tie-down design; standard footing and slab design; structural steel design; standard in-ground pool design; retaining wall design; hydraulic plans; and engineer inspections at slab, frame, retaining wall and pool stages.
An energy efficiency report for your home is included.
One 8-hour appointment in our office with our Interior Designer, with full final documentation for review; 1 × Plan Review meeting in the office; Electrical Review meeting in the office with the electrician; review meeting after receiving all selections and PCV costs; and an electrical walk-through on site once frame and roof are installed.
Domestic building insurance as required by legislation.
As per government requirements.
Domestic assessment and final stage; pool assessment, approval, inspection of pool fencing and issue of Form 17; Professional Indemnity (PI) insurance levy; BCC electronic lodgement all classes; Fast Track (2 business days); QLD Dept of Natural Resources title & survey search ×2. Does not cover development applications or other fees not noted — owner responsible for gaining all signed permissions from neighbours.
Provision included. Connection to be organised with the NBN retailer.
No town planning fees included.
Not included.
Connection fees not included. Electricity account to be in the client's name.
Not included.
60 l/m of 350 mm diameter concrete piers — unreinforced, 20/20/80 concrete — to be confirmed by structural engineering design and site inspection by our engineer.
A flat base for the slab allowing drainage and consistent moisture level, per engineering requirements.
Labour for the pour. House slab for an M-class site only, assuming a 300 mm waffle-pod design, 85 mm thick slab, SL82 mesh. Alfresco and pool area poured with the main slab — broom-finished grey concrete, to be tiled.
Provisional sum of $15,000.00 incl GST for steel works subject to engineering. Crane for additional steel factored into the PS once engineering is received; additional steel also incurs labour-install costs. No portal frames included (subject to engineering, incl. steel lintel over garage door). Additional steel priced on receipt of structural design. Shop drawings not allowed — LanCon can produce simple steel drawings; if more complex, the fabricator's cost will be advised.
Flickguard sheet membrane: slab penetrations (17), perimeter (56 lm), pier/column (1), external construction joint (6.5 lm).
Engineered frames, floor system and trusses as per plans; bracing per engineering plans; engineered floor system of joists and level/legal beams with 19 mm yellow-tongue flooring; step-downs to wet areas.
All framing hardware and tie-down requirements to N2 wind rating.
Enviroseal Proctor Wrap to ground and first-floor cladding; R2.7 wall insulation to ground-floor cladding; R3.0 thermal ceiling batts to internal ceilings (external ceilings not included); acoustic R1.5 wall batts to rumpus and music area.
As per plans. Standard Low-E tinting included; final glazing subject to the energy efficiency report.
Custom orb Colorbond roof, fascia and gutter including all flashings in standard colour range; sisalation foil; temporary downpipes; 3 lowset Colorbond 100 × 75 mm downpipes to the zero-boundary wall only.
HH300 hoods in standard powder-coat colour (colour/finish to confirm): Hood 1 full-surround 15.54 lm with 2 corners, 4 returns, 8 joiners; Hood 2 — 2,410 mm; Hood 3 — 2,430 mm; Hood 4 3-sided 1,590 mm with 2 downward returns 2,450 mm and 2 joiners.
Supply and install as shown on plans — PGH Nature or Impressions range, grey mortar, raked joint. Rear and alfresco only — 17.72 m² total.
James Hardie Scyon Axon Smooth 133 mm; James Hardie Fine Texture 8.5 mm; NRG Greenboard 60 mm — locations per plans (front, left, right and rear, lower and upper levels).
4.5 mm fibre-cement sheets with H-mould, as per plans.
Render to NRG Greenboard (front, left, right and rear elevations) and to slab edge.
Block retaining walls, precast concrete retaining walls (developer to supply and install), retaining-wall drainage and retaining-wall waterproofing — all excluded.
Level 4 finish, one pre-paint coat, linings direct-fixed to frames. Ceilings: 10 mm Supa-Ceil with back-blocking. External ceilings (porch, alfresco, 2 balconies): 10 mm WR plasterboard on 16 mm direct-fixed metal battens. Highset house — 2720 mm ground and upper ceilings, timber framed.
Full-height VJ EasyVJ panel wall lining to the living room, as per plan.
Open-rise staircase: Durian treads 270 × 42, Durian risers 195 × 19, Durian closed stringers 270 × 43. Balustrade 5 m raking — powder-coated steel handrail, 12 × 12 square vertical balusters, 50 × 10 flat newel posts.
Rough-sand subfloor, check levels and moisture; supply and install prefinished engineered oak 190 × 14 (colour TBC) by trowel-glue method to study, linens and hallway on first floor — 34 m². 3 mm gap left around cabinetry for silicone by others.
Mechanically polished (minimal/random exposure, semi-gloss): 50/60-grit metal-bonded diamonds; hand-filled cracks and holes; 120-grit fill and grout; densified; polished 50→400 grit; premium penetrating sealer, burnished.
Light-grind slab preparation; full-flake finish (locations per plans).
Soft-close 100° hinges with lifetime warranty; drop-down finger pulls to overheads; shark-nose mitred pulls to lower cabinetry; 1100 mm fridge overhead with vent; 600 mm wide tall wall-oven tower with 2 pot drawers; flat servery with melamine front; integrated dishwasher front; under-bench microwave cupboard with pot drawers; Hafele One2Five pull-out bin to island; pull-out caddie to sink cupboard; HMR white cupboard interiors; 16 mm solid backs throughout. Butler's pantry: 3000 mm of lower + overhead cabinetry; 4 × 3000 × 400 cleated pantry shelves; 500 mm tall broom cupboard; 2200 mm of overhead cabinetry.
Corinthian Platinum 4000 steel cavity units with closing jambs — 2 × 2340×920 (entertaining area, pantry), 2 × 2340×820 (bed 1 WIR, bed 1 ensuite); pre-primed 160 × 30 garage-door jambs.
Zanda Stealth digital deadbolt; Zanda Polo 600 mm pull; Zanda heavy-duty roller bolt; Gainsborough Smooth Scyl deadbolt (satin brass); 6 × Alba 700 passage sets, 2 × Alba 710 privacy sets, 3 × Alba 720 dummy sets (large rose, SB); Gainsborough cavity passage + privacy (satin brass); 7 × Zanda magnetic stops; 3 × Zanda bump stops (satin brass); 3 × DM02CP magnetic cupboard catches.
Supply and install of 2.4 m × 4.8 m sectional panel-lift garage doors in Stoddart's standard styles (Georgian, Regency, Mediterranean, Cosmopolitan) and standard colour range, including Avanti auto opener, 2 × handsets and 1 × wall button. Security Bundle included — Wi-Fi compatible opener with built-in camera connectable to the CGD smartphone app, plus lock latch.
Spray-concrete mix 32 MPa; min 200 mm wall thickness; 1.2 m depths; 2 internal steps and 1 bench; Class 9 PVC plumbing; pool steel earth bar; 12 m pool — steel reinforcing supply to AS/NZS4671 and AS3600 with engineer steel inspection. Finishing schedule allowances via pooltile.com.au: 400 × 400 × 20 mm coping by LanCon; 1–2 mm pebble interior (Ice Blue / Salt & Pepper); ceramic waterline tile band; V-Lock skimmer lid tray.
Astral APA skimmer box (large basket); 4 × 40 mm clear eyeball returns; main drain with hydrostatic relief valve; Astral P320XT Viron pump (9-star); Astral CA340 sand filter; Astral Halo 35 saltwater chlorinator (sodium & element pool minerals); 4 × Astral SLX RGBW LED lights; Astral Halo 4 transformer with phone-app control; Zodiac DX3000 robotic cleaner (floors & walls); 13 m manual vacuum handover kit.
Removal of excess construction material; rubbish collection and site clean; water balance and pool clean; start-up chemicals and sodium & magnesium salts; comprehensive handover and tutorial session.
Panasonic S-Series R32 ducted 16 kW reverse-cycle, high-efficiency inverter, 5-year parts & labour warranty; My Place IQ with Wi-Fi/app control and Linux tablet; 7 zones; 8 round ceiling diffusers + 1 baby linear diffuser with flexible ductwork; nanoe X air purification; 2 × additional wireless temperature sensors; 2 × air divertors (condenser near boundary). System cools up to 75% of floor area at peak efficiency; all houses retain a permanent zone.
Provisional sum $14,000.00 incl GST — supply and installation of 10 kW solar panels.
Underground marking tape; underground Telstra conduit with draw-string to boundary (6–20 lm); earthing of slab reo; island-bench conduit; temporary power for construction; 3-phase meter box; 3-phase underground mains/sub-mains (10 lm).
Electric HWS circuit with isolating switch (1); undermount rangehood with 150 mm duct kit (1); electric wall-oven circuits with safety switches (2); induction cooktop with isolating switch (1); 32 A 3-phase dedicated circuit (1); Tesla Wall Connector Gen 3, 7.3 m Type 2 cable (1); additional circuits & safety switches (3 + 2 lighting); double power points (28); double weatherproof points (1); single points (5).
1200 mm LED battens (2); black LED twin spotlights (2); Southampton 1LT pendant black/clear — island bench if not in spec (3); 316 stainless up/down wall lights (1); white LED 90 mm downlights (52); Elfa LED square inset step lights (3); white gimble lights (4). White acrylic 4-blade outdoor ceiling fan with Iconic mech (1); white ducted exhaust fans to external (3); white timber 4-blade Futura ceiling fans with Iconic mech (4). 2-way light switches (3); run-on timer (1); photo-electric hard-wired interconnected smoke alarms with battery backup (7); 16 A single-phase dedicated circuit with isolating switch for pool heater (1).
TV aerial (1); NBN set-up (1); TV points (3); data/phone points (2); intercom with electric striker on front wall up to 15 m from house (1).
Under-slab and drainage — sewer fixture connection and sewer connection (Class soil only, 8 points); allowance for hot & cold water to island bench; no allowance for drainage to retaining walls. Rough-in — 20 points; fridge tap; 3 hose taps + 1 hot-water system; 2 stacks; 90 mm round PVC downpipes. Fit-off — 20 points. Final inspection and certificate.
$25,770.00 allowance as scheduled (landscaping allowances table in Your Investment).
$11,000.00 allowance for excavation works.
Fees not included.
Not included.
Not included.
Not included.
Civil works or fees not included.
Meters and connection fees not included — new meters assumed in place, ready for connection.
No allowance included.
No allowance to remove existing structures, rubbish, rubble, fencing, retaining walls or other material from site. Owner to ensure the site is clean with free access for the builder to commence. No allowance for sites requiring special management due to fire ants.
The dollars that flex. Each allowance is a stated value inside your fixed price — adjusted to actuals as selections and engineering land.
| Item | Allowance (incl GST) |
|---|---|
| Structural steel & fabrication — subject to engineering | $15,000.00 |
| Solar — supply & install 10 kW panels | $14,000.00 |
| Landscaping allowances | $25,770.00 |
| Excavation works | $11,000.00 |
| Pool works — pool, fence, electrical, pool void, tiling | $80,182.10 |
Additional steel (beyond the PS) also carries labour-install costs and crane time, priced on receipt of structural design. Pool finishing selections draw on the pooltile.com.au schedule. Landscaping and excavation allowances are adjusted to final design and site conditions.
Where the budget can flex. Each item below already sits inside your fixed price as a stated allowance or provisional sum — adjust the selection, adjust the spend.
| Flexible item | Current allowance | What changes it |
|---|---|---|
| Pool works — finishes, fence, tiling, equipment tier | $80,182.10 | Waterline tile, pebble finish, cleaner and lighting tiers |
| Landscaping allowances | $25,770.00 | Planting scale, paving areas, retaining garden edges |
| Structural steel & fabrication (PS) | $15,000.00 | Engineering design — resolved once steel drawings land |
| Solar — 10 kW supply & install (PS) | $14,000.00 | System size and panel tier |
| Excavation works | $11,000.00 | Final site levels and soil conditions |
Final costs on provisional sums are calculated at cost plus builder's margin as per the Master Builders Contract. A wider set of cost-saving options is being finalised with LanCon and will be added here before contract.
Collected in one place — the same exclusions that appear in context within Inclusions, followed by the full terms and conditions of this tender. Nothing new, nothing removed.
The complete terms from the Tender Specification, grouped for readability. Wording unchanged.
Your price is based on site and soil conditions to suit your particular site (unless otherwise stated) and includes Portable Long Service Levy, QBCC Insurance, engineered frame and roof trusses as per the Building Code of Australia. Please note any items not specifically noted in the above contract have not been included. Should you require additional clarification or items added to your contract, please let us know.
Your builder charges a $350.00 administration fee for each and every variation requested by the Owner, or a change from the above contract that occurs on site, subsequent to execution of the contract and completion of colour and inclusion selections. Variations are changes, additions, deletions and all alterations to contract, colour selection, allowances, or prior variations. All variations are subject to your builder's approval and are to be paid for in full prior to work commencing. The Owner is NOT to give any directions to any sub-contractor regarding changes to plans or specifications. All requests for changes must be made directly to your builder so your Builder always remains in full control of your job.
LanCon uses its best endeavours to estimate the cost of an item in the tender; however, sufficient detail is not always available at the time and cannot be determined until further design or detailed plans are prepared. All effort will be made to determine the fixed price by the time a contract is prepared. Final costs on provisional sums will be calculated at cost plus builder's margin as per the Master Builders Contract.
In the event of a Global Event which limits the supply of materials, and therefore escalates the cost of a product, LanCon reserves the right to pass the cost on to the client, with a 20% builder's margin. A Global Event is such as a major weather event, natural disaster, or a political event such as war or trade restrictions which directly results in an increase in the price of the particular material.
Due to changes in labour rates and building materials, tender pricing issued from LanCon is only held for 60 calendar days. Should you have an expired tender price, please contact your sales person to provide you with a revised tender.
Your Builder insures your home against material loss or damage during construction with a builder's all-risk policy with an approved insurance agency. Your builder pays the applicable excess if the need arises to make a claim. (Note: insurance does not cover materials bought on to or left on site by Owner or Owner-supply items.) This policy expires at the time of handover. Any variations will attract additional insurance charges to be calculated and submitted to you for payment with your claim payments.
It is the Owner's responsibility to pay any charges and fees not directly related to building work, such as infrastructure charges (e.g. for roads) and any non-building charges. Any bonds required to be paid are the responsibility of the Owner. Any additional fee related to a Relaxation Application to BCC and certifier administration fees are at the expense of the owners. Please note Relaxation Applications can add up to 6 weeks on pre-administration time.
Unless otherwise allowed for in the contract, all survey pegs will be required prior to the commencement of any earthworks. The Owner will be responsible for identifying and replacing any and all missing or displaced survey boundary marks at additional cost to the Owner. Prior to completion, LanCon will clear rubbish from the site and re-establish falls away from the dwelling. Any future change to the final levels by the Owner may negate any warranty given by LanCon regarding termite inspection zones or building performance. LanCon will provide site drainage in accordance with the BCA. Yard gullies to assist in drainage of excess groundwater will be subject to future variations.
As per engineering, step-up bedding to bathrooms to allow fall for the floor waste. All concrete slabs and footings are constructed in accordance with the Engineer's design and report and AS2870.1. Foundations must be prepared so that footings are placed on level undisturbed material. Finish to internal monolithic slabs including garages is a steel-trowelled finish. Finish to external monolithic slabs is a broom finish unless otherwise specified in the working drawings. Note: due to product inconsistencies in concrete and changing environmental site conditions, LanCon is unable to guarantee against shrinkage cracking in excess of tolerances provided for in the QBCC Standards and Tolerances Guide.
Unless otherwise allowed for under the contract, no allowance has been included for the removal or disposal of spoil material or loose material dumped from adjoining building works. Should any stockpiled spoil on site interfere with the construction, the stockpiled spoil will be removed from site on the owner's behalf and at the owner's expense, and a variation to the contract will be issued in accordance with Clause 19 of the General Conditions of Contract.
Unless otherwise allowed for under the contract, no allowance has been included for rock excavation or rock removal and disposal (including associated costs). Rock is deemed as any material unable to be excavated or ripped using standard drott or backhoe machinery. Any additional costs will be payable by the owner when rock is encountered on site — from either excavation from the site cut, piers/footings, retaining walls, driveway shaping or trenching for services. Any additional costs due to rock will be invoiced with builder's margin as per the Master Builders Contract.
Unless otherwise allowed for under the contract, no allowance has been made to remove existing structures, rubbish, rubble, fencing, retaining walls or any other material from site. It is the owner's responsibility to ensure the site is clean and has free access for the builder to commence works. No allowance has been made for sites requiring special management due to fire ants.
If the builder proceeds to commence works in accordance with the contract and the site is not clean and/or does not have clear access available, then any additional works to clean the site and make good ready for commencement will be undertaken by the builder and all associated costs will be included in a variation to the contract to be executed in accordance with Clause 19 of the General Conditions of Contract.
Unless otherwise stated, allow for level house site, by Owner. On acreage sites, the Owner is to stake the four corners of the house before excavation commences. If rock is encountered, excavations will be charged as an extra to the Contract. Surplus material to be spread/stockpiled over the site. Excavated material, soil, trees, etc. to be stockpiled on site. Your builder will include a vegetation scrape to 300 mm to the house pad only. Unless stated, retaining walls, rock excavation, cut & fill and soil removal are not included in this contract. Unless otherwise allowed for under the contract, no allowance has been included to remove or repair damage from tree roots which have affected any existing services. If any works are required due to tree roots or council protected trees, all additional costs will be the responsibility of the owner.
Unless otherwise allowed for under the contract, no allowance has been included for tree or stump removal (including grinding) in the building envelope or zone of influence unless specifically noted otherwise. Should the Engineer determine that surrounding trees may influence the integrity of the foundations, the owner is to provide an arborist report. Recommendations within the report MUST be implemented by the owner. Warranty of the slab will be voided if the owner ignores the arborist's recommendations. Where owners are removing any trees in the zone of influence, it shall be the owner's sole responsibility to install root barriers to all remaining trees on or affecting the site.
Site access is the responsibility of the Owner. Any costs incurred by the Builder due to difficult site access, including hand-carting of materials and/or additional crane hire, will be at extra cost to the owner. Examples of additional costs that may apply are (but not limited to): additional crane hire, materials handling, additional scaffold requirements, concrete pumping, out-of-hours work, traffic control, associated permits and fees. Any work carried out to achieve suitable site access will be at the cost of the owner and may incur an extension of time. The Owner is to give notice to LanCon's site supervisor to arrange a mutually agreed time to visit the building site at a reasonable time during work hours. The Owner will be able to inspect the works at the following stages: slab complete, roof cover complete, internal linings complete, external claddings complete, prior to tiling, and a pre-handover inspection. Site visits may be restricted at any other time and must be arranged with the Site Supervisor prior to entering the site. If you do enter the site unaccompanied by the site supervisor, you will be politely asked to leave by any trade contractor working on the site and to phone the site supervisor to arrange a time to visit. LanCon understands you are keen to see the progress of your new home and are not always available to inspect the home during normal working hours; however, we have obligations under law to protect all people on a construction site. If you choose to visit the site outside of normal working hours, you do so at your own risk and LanCon can assume no liability whatsoever. If any security gates are in place, the gates must be closed again on exit from the site and all care must be taken around scaffold, void platforms in stairwells and rubbish cages.
LanCon takes no responsibility for damage, either existing or due to the construction on the site, because of the access required by delivery trucks and construction vehicles. Heavy equipment is used in the building industry and even with extra care, damage to existing improvements can occur. The Owner will be responsible for all associated repair costs.
Your Building Contract is dependent on us receiving a Soil Test and Slab Design, consisting of Engineer tests for Foundation Data and Slab Design. Construction of the slab will be in accordance with QBSA requirements for the site class.
Unless otherwise allowed for under the contract, no allowance has been included in the scope of works for survey peg reinstatement. Survey pegs are required to be in place before works commence on site. The owner is to confirm that sufficient pegs are in place before works commence. Should survey pegs not be in place when works commence, a licensed surveyor will be engaged to reinstate the pegs on the owner's behalf with all costs payable by the owner, with the agreed builder's provisional sum margin allowance specified in the contract applied.
Should LanCon be required to provide piering to a slab edge in proximity of a Zone of Influence, or for services as per Engineer's Report, the owner understands that the piering allowance may exceed what has been allowed for in this tender and any additional cost will be at the owner's expense.
Unless otherwise specified, the contract price allows that town water supply will be available from an existing main of the Local Authority prior to commencement of construction. Otherwise, the Owner is to arrange at their expense a temporary fresh water supply for building purposes to the satisfaction of the Builder, prior to site start. Client is responsible for meter connection and all associated costs. LanCon connects from the meter to the house.
Power supply to the site during construction is the responsibility of the owner including connection costs. It is the owner's responsibility to set up an electricity account with the service provider when instructed by the builder and to cover the costs of the meter installation fee. Where no such power is available, the Owner is to arrange temporary power suitable to the Builder at the Owner's expense. Please note: delays in setting up the electricity account will delay the construction of your home. The underground power connection is based on a 6 m setback (unless otherwise stated); it is not to exceed 1 m from the front boundary of the contract property. The contract price does not allow for any power connections or cabling outside the boundaries of the contract property, or the installation of mains power pillar-boxes or connections to in-line supply.
Unless otherwise stated, a permanent power pole has not been included with the contract.
Install gas lines and testing of gas appliances to suit — LP gas includes automatic changeover regulator. Bottles are to be supplied by the Owners. Connection to natural gas to be organised by Owner. Owner to advise Builder prior to Contract Plan if gas is natural or LPG. Owner to organise run-in of gas main if natural, or organise installation of gas bottles if LPG.
No allowance has been made should local council require the level of the building platform/floor slab to be raised to meet any minimum floor level requirements. If required, then all associated costs including importing fill, machine hire, survey to determine AHD, engineers' slab design fees, local council fees, drafting fees and administration fees will be incurred by the owner and charged as a contract variation.
Unless otherwise allowed for under the contract, no allowance has been included in the scope of works for the project management of, or application or lodgement (including any associated fees) of Town Planning documentation. If the Building Certifier deems the project requires a Town Planning approval prior to a Building Approval, then this is the responsibility of the owner to lodge, pay all associated fees and obtain approval for, unless otherwise agreed with LanCon. Unless otherwise stated, no allowance for extra conditions has been included.
Unless otherwise allowed for under the contract, no allowance for a height certificate has been included in the scope of works. Please note that the current building regulation is a maximum building height of 9500 mm and/or a wall height of 7500 mm above natural ground level; however, any building to be constructed within 300 mm of the maximum building height requires an additional survey to be provided to the certifier to confirm that the building will comply within the building regulations.
Unless otherwise allowed for under the contract, no allowance has been included to provide a design assessment, engineering, Queensland Urban Utilities application fees or certification for a Build Over Sewer.
In addition to Clause 15 of the General Conditions of Contract and unless otherwise allowed for under the contract, if Council nominate a requirement for CCTV footage of stormwater drains before and after works (due to building over/near stormwater), this will be an additional cost which will be payable by the Owner in accordance with Clause 19 of the General Conditions of Contract.
Privacy screens are subject to assessment under the Small Lot Code and scope of works may vary subject to Building Approval requirements. Unless otherwise allowed for under the contract, no allowance has been included and this will be determined by the Certifier during construction inspections.
Unless otherwise allowed for under the contract, no allowance has been included for a driveway crossover application.
Climate/bushfire code requirements will vary depending on individual site conditions. Any additional building requirements due to Fire Rating Assessments will be additional cost to the Owner.
Any extra works, labour or materials due to building covenants by Developer or Council not covered in the standard inclusions will be an additional cost to the Owner.
Your new home has been designed in accordance with Queensland Development Code 4.1 — Sustainable Buildings, 6-star energy efficiency rating. To meet the required rating the builder has allowed for the following energy efficiency materials within your home: R1.5 wall batts to all external walls, R2.0 ceiling batts to all roof spaces and Sisalation to all external walls. If additional products are required based on your design, additional costs will be passed on to you by way of variation. This house/development is subject to local council assessment using the Nationwide House Energy Rating Scheme plus Brisbane Rating Scheme. Items that may be affected are windows, hot water systems, additional shading devices, increased insulation, solar panels required, eaves, etc. Any additional costs relating to the above assessment will be an additional cost to the contract, borne by the owner. The specified energy efficient requirements may change subject to external colours selected. Dark coloured roofs and external walls may require additional energy rating requirements which will be nominated on the completed Energy Efficiency report and will be an additional cost if not already included in the scope of works.
You have a six (6) year structural warranty on the dwelling. Please note that driveway, pathway concrete, landscaping and fencing are not structural elements of the dwelling and therefore not covered by the builder's six-year guarantee.
All warranties for appliances, hot water systems, etc. are the responsibility of the Manufacturer. For claims regarding these items please refer to the instruction manual for the item affected. All materials are provided as per manufacturer's supply and are subject to manufacturer's warranty terms and conditions. All supplied materials are warrantied to acceptable tolerances as outlined by Australian Standards, manufacturer's design or BCC design criteria. Your builder cannot provide warranty on timber posts against weathering, splitting or warping, and your builder does not provide warranty against weather entering pivot doors. Dark paint colours may void supplier warranties which LanCon will not be covering replacement or rectification for. Please ensure colours chosen have an LRV of <40%.
After practical completion and prior to expiration of the Defects Liability Period, you are to provide your Builder a written list of any alleged defects. Your Builder is not responsible for rectifying any alleged defects which are due to something still to be supplied or completed by the Owner, or for an item or thing altered or amended by the Owner.
Your builder provides a 12-month maintenance period from the practical completion date of your home in accordance with the provisions of standard policy.
Disconnection of existing services, rainwater tanks, tree removal from site, retaining walls and rock excavation will all be carried out at the Owner's expense.
Any owner supplied (and/or installed) items are to remain the responsibility of the owner. LanCon will not accept responsibility for any damaged, stolen or faulty products on site. All quantities and take-offs are to remain the responsibility of the owner. Owner's responsibilities include but are not limited to the following: any Owner supplied items are to have all product model, specification and installation documentation provided to the Builder prior to contract signing; items supplied must meet the current legislation regarding the supplied items; liaise with the site supervisor for when the item is required on site; any delays caused by owner supplied items may incur variation costs and extensions of time; LanCon cannot provide warranty or maintenance on any owner supplied materials, and LanCon or LanCon subcontractors can refuse installation if not to Australian Standards or by their judgement.
During construction, the builder is solely responsible for the health and safety of all people on the site. It is standard policy to NOT provide keys until official handover. Due to Workplace Health and Safety Regulations, the owner is not permitted to enter the property at any time during construction (including after hours and weekends) without the express permission of the builder. Persons entering the site must be accompanied by a duly authorised representative of the builder and all personnel must comply with WHS regulations for PPE requirements. Closed safety footwear must always be worn on site. Persons failing to adhere to these rules will be ejected from the site. Whilst every effort will be made, please try to allow 48 hours' notice for the supervisor to provide access to the site. Payment must be paid in full prior to the release of keys. Handover will take place within two weeks of Practical Completion.
All and any surplus building materials remain the property of LanCon.
Where the exposed slab edge is forming part of the management system, a minimum of 75 mm must be maintained above the surrounding levels and must not be rendered, tiled or covered by soil/bark chip to conceal termite activity. The slab edge may be painted. LanCon will provide, from the manufacturer, product warranties extending to all materials used in the termite barrier. It is the Owner's responsibility after handover to ensure that regular inspections are carried out on the home and all visual barriers are maintained clear of debris, applied finishes or landscaping. The Owner agrees to pass on the information about the maintenance of the termite barrier for the life of the building to any subsequent Owner.
Unless otherwise allowed for under the contract, no allowance has been included for the removal or reinstatement of any boundary fence. Should the fence be required to be removed for construction purposes, any costs incurred will be forwarded to the owners by way of variation. The owner will be advised of any fence sections requiring to be altered, and it will be the owner's responsibility to obtain/confirm permission from adjoining neighbours. Any cost sharing for dividing fences is the responsibility of the Owner to negotiate with the adjoining owner.
We have only included a builder's clean, which is not at the same level as a domestic spotless clean. LanCon is not liable for any cleaning to neighbouring properties due to wind and weather conditions. Any requests from neighbouring properties will be forwarded to you for negotiation and processing. LanCon does not cover neighbouring properties and requests.
The designs and this specification always remain the copyright and intellectual property of Elevate Design Studio and LanCon and cannot be copied or used for any purpose other than the construction of the home at the site address shown on the accompanying plan. The plans may be copied to provide to contractors for the purposes of quoting on work to be carried out only on the property noted in the accompanying plans.
Written detail always takes precedence over drawings. Details specified in this inclusions schedule have precedence over plans and working drawings where such item does not have an impact on the structural integrity of the structure.
Please note that Construction Plans and the Personal Inclusions list supersede all Standard inclusions. Any illustration is an artist's impression only and does not represent part of the contract.
The colours, finishes and materials will be as nominated in this Specification, the Schedule of Amendments to Standard Inclusions, and the Schedule of Standard Inclusions which form part of the contract documentation. Colours may vary from those indicated in brochures, samples or colour boards due to changes in base materials used, or different manufacturers using similar product descriptions. LanCon reserves the right to amend the material specification and change suppliers from time to time without notice, providing the items supplied will always be of a similar quality to that noted in the Schedule of Standard Inclusions.
We cannot take responsibility for any colour variation in the roof tile, Colorbond, brick, ceramic wall and floor tile, stone or granite bench tops or any other product, between those shown in displays or brochures to those delivered by the manufacturer. These products may vary slightly in colour from time to time and any discrepancy is the responsibility of the manufacturer. Please ensure that all colour selections are in writing and signed by the Owner to ensure that you receive the products ordered.
From acceptance to handover, the journey is structured — you always know what happens next.